ANALISIS JALUR KRTIK PROYEK MENGGUNAKAN METODE CPM DI PT SURYA ENERGI INDOTAMA (Studi Kasus PLTS H2MS Krakatau) (TA.8.24.002)

Rahmadania, Zahra (2024) ANALISIS JALUR KRTIK PROYEK MENGGUNAKAN METODE CPM DI PT SURYA ENERGI INDOTAMA (Studi Kasus PLTS H2MS Krakatau) (TA.8.24.002). Diploma thesis, Universitas Logistik dan Bisnis Internasional.

Full text not available from this repository.
Item Type: Thesis (Diploma)
Subjects: H Social Sciences > HD Industries. Land use. Labor
Divisions: Sekolah Vokasi > Administrasi Logistik D3
Depositing User: Alia Nurul Faadiyah
Date Deposited: 17 Jul 2025 07:45
Last Modified: 17 Jul 2025 07:45
URI: http://eprints.ulbi.ac.id/id/eprint/3301

Actions (login required)

View Item View Item