WINASTI, MOREZA (2025) PENERAPAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) UNTUK PENJADWALAN PROYEK PLTS DI PT SURYA ENERGI INDOTAMA (STUDI KASUS EPC PLTS APC ECOGREEN BATAM). Diploma thesis, UNIVERSITAS LOGISTIK DAN BISNIS INTERNASIONAL.
Full text not available from this repository.Abstract
ABSTRAK Winasti, Moreza. 2025. PENERAPAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) UNTUK PENJADWALAN PROYEK PLTS DI PT SURYA ENERGI INDOTAMA (STUDI KASUS EPC PLTS APC ECOGREEN). Laporan Tugas Akhir, Program Studi DIII Administrasi Logistik Universitas Logistik dan Bisnis Internasional, Bandung. Pembimbing: Dr. Noneng Nurjannah, S.P., M.T. Keterlambatan dalam penyelesaian proyek merupakan tantangan utama yang dapat memengaruhi efisiensi biaya, reputasi perusahaan, dan keberlanjutan operasional. PT Surya Energi Indotama (SEI) sebagai kontraktor utama proyek Pembangkit Listrik Tenaga Surya (PLTS) di Indonesia menghadapi masalah serupa pada beberapa proyek sebelumnya. Penelitian ini bertujuan untuk menerapkan metode Program Evaluation and Review Technique (PERT) guna mengidentifikasi jalur kritis, memperkirakan durasi penyelesaian proyek, dan menghitung probabilitas penyelesaian tepat waktu pada proyek EPC PLTS APC Ecogreen. Penelitian dilakukan dengan pendekatan kuantitatif menggunakan data primer dari aktivitas proyek, termasuk estimasi waktu optimis, realistis, dan pesimis. Hasil analisis menunjukkan bahwa jalur kritis proyek terdiri dari aktivitas Office and Warehouse on Site & Machinery, Ballast Rack Inverter, Installation Rack Inverter, Installation of AC Cable Trays, Installation of AC Cabling, Testing & Commissioning, dengan durasi penyelesaian proyek selama 102 hari. Probabilitas proyek dapat diselesaikan dalam waktu yang direncanakan 103 hari adalah sebesar 56,74%. Dengan demikian, penerapan metode PERT terbukti efektif dalam memberikan prediksi yang lebih akurat terhadap durasi proyek dan mendukung pengambilan keputusan dalam manajemen waktu proyek. Kata Kunci: Penjadwalan Proyek, Jalur Kritis, Probabilitas Penyelesaian Proyek vii Universitas Logistik dan Bisnis Internasional ABSTRACT Winasti, Moreza. 2025. APPLICATION OF PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) METHOD FOR SCHEDULING OF PLTS PROJECTS AT PT SURYA ENERGI INDOTAMA (CASE STUDY OF EPC PLTS APC ECOGREEN). Final Project Report, Study Program DIII Logistics Administration International Logistics and Business University, Bandung. Supervisor: Dr. Noneng Nurjannah, S.P., M.T. Delays in project completion present significant challenges that can impact cost efficiency, company reputation, and operational sustainability. PT Surya Energi Indotama (SEI), as the main contractor for Solar Power Plant projects in Indonesia, has encountered such delays in several of its previous projects. This research aims to apply the Program Evaluation and Review Technique (PERT) method to identify the critical path, estimate project completion duration, and calculate the probability of on-time completion for the EPC PLTS APC Ecogreen project. The study employs a quantitative approach using primary data from project activities, including optimistic, most likely, and pessimistic time estimates. The analysis results show that the project’s critical path includes activities Office and Warehouse on Site & Machinery, Ballast Rack Inverter, Installation Rack Inverter, Installation of AC Cable Trays, Installation of AC Cabling, Testing & Commissioning, with a total duration of 102 days. The probability of completing the project within the scheduled time of 103 days is 56,74%. Thus, the application of the PERT method proves to be effective in providing a more accurate prediction of project duration and supports better decision-making in project time management. Keywords: Project Scheduling, Critical Path, Probability of Project Completion
| Item Type: | Thesis (Diploma) |
|---|---|
| Subjects: | H Social Sciences > HD Industries. Land use. Labor |
| Divisions: | Sekolah Vokasi > Administrasi Logistik D3 |
| Depositing User: | PKL Sepuluh Sepuluh |
| Date Deposited: | 26 May 2026 07:20 |
| Last Modified: | 26 May 2026 07:20 |
| URI: | http://eprints.ulbi.ac.id/id/eprint/3965 |
Actions (login required)
![]() |
View Item |