Items where Author is "Pramudita, Aditia Sovia"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 14.

SILALAHI, NIKEN AYU MELINA and Waskito, Saptono Kusdanu and Pramudita, Aditia Sovia (2023) ANALISIS PEMESANAN BARANG PADA PT G MENGGUNAKAN METODE ECONOMIC ORDER QUANTITY (EOQ) PROBABILISTIK (1.6.4.23.045/NIK/A). Diploma thesis, ULBI.

JELCHA, NAUFAL RAIHAN and Kusdanu, Saptono and Pramudita, Aditia Sovia (2023) ANALISIS PERUBAHAN LOKASI GUDANG PT BRODO GANESHA INDONESIA MENGGUNAKAN METODE CENTER OF GRAVITY (COG) (1.6.4.23.047/NAU/A). Diploma thesis, ULBI.

ZULFIKAR, DICKY and Yanuar, Amri and Pramudita, Aditia Sovia (2023) PENGARUH MARKETING MIX TERHADAP KEPUASAN PENGGUNAAN LAYANAN PADA PT POS INDONESIA (PERSERO) DI KOTA BANDUNG (1.6.4.23.073/DIC/P). Diploma thesis, ULBI.

ARIF, TORIQ KHUSUFAN and Hilman, Tamadara and Pramudita, Aditia Sovia (2023) Analisis Pengendalian Kualitas Penanganan Fabric di Divisi Cutting Melalui Penerapan Metode Statistical Quality Control pada PT Pancaprima Ekabrothers (1.6.4.23.066/TOR/A). Diploma thesis, ULBI.

RAJAGUKGUK, TIONA AMANDA JOSEPHINE and Hilman, Tamadara and Pramudita, Aditia Sovia (2023) ANALISIS KELAYAKAN PEMBELIAN KENDARAAN MILIK SENDIRI UNTUK MELAKUKAN PENGANGKUTAN WATER TREATMENT PLANT (WTP) RUTE BANDUNG-JAKARTA (1.6.4.23.033/TIO/A). Diploma thesis, ULBI.

PUTRI, EGA ANDRIANI and Fayaqun, Reza and Pramudita, Aditia Sovia (2023) ANALISIS PENJADWALAN DISTRIBUSI BERAS DI PERUM BULOG KANWIL BENGKULU DENGAN METODE DISTRIBUTION REQUIREMENT PLANNING (DRP) (1.6.4.23.004/EGA/A). Diploma thesis, ULBI.

Kurniawati, Nita Kurniawati and Hilman, Tamadara and Pramudita, Aditia Sovia (2023) PENERAPAN DATA MINING UNTUK PERANCANGAN KOMPOSISI PENJUALAN PRODUK MNH GRAPHIC & ART (1.6.4.23.003/NIT/P). Diploma thesis, ULBI.

Nuraini, Rini and Waskito, Saptono Kusdanu and Pramudita, Aditia Sovia (2023) ANALISIS PENGENDALIAN PERSEDIAAN LASEGAR DI PT GLOBAL TATA PERMATA MENGGUNAKAN METODE ECONOMIC ORDER INTERVAL (EOI) – MULTI ITEM (1.6.4.23.002/RIN/A). Diploma thesis, ULBI.

Saputro, Angga and Pramudita, Aditia Sovia and Waskito, Saptono Kusdanu (2023) PENGENDALIAN PERSEDIAAN SPARE PART PESAWAT CN�235 DENGAN MENGGUNAKAN METODE EOQ (ECONOMIC ORDER QUANTITY) PROBABILISTIK DI PT DIRGANTARA INDONESIA (1.6.4.23.021/ANG/P). Diploma thesis, ULBI.

Rafli, Muhammad and Pramudita, Aditia Sovia and Waskito, Saptono Kusdanu (2023) PEMILIHAN VENDOR PENGADAAN RODA SOLID KERETA PADA PT KERETA API INDONESIA (PERSERO) DI BANDUNG MENGGUNAKANN METODE PROFILE MATCHING (1.6.4.23.005/MUH/P). Diploma thesis, ULBI.

Lestari, Ike Fuji and Waskito, Saptono Kusdanu and Pramudita, Aditia Sovia (2023) ANALISIS PERAMALAN PERSEDIAAN SEPATU DAN SANDAL PADA PT BRODO GANESHA INDONESIA MENGGUNAKAN METODE EOQ PROBABILISTIK (1.6.4.23.010/IKE/A). Diploma thesis, ULBI.

HENDRAWAN, RACHMAD and Pramudita, Aditia Sovia and Sulistiyaningsih, Febriani (2023) ANALISA PERSEDIAAN BAHAN BAKU MENGGUNAKAN METODE ANALISIS ABC (ACTIVITY BASED COSTING) DAN METODE EOQ (ECONOMIC ORDER QUANTITY) PADA PT PANCAPRIMA EKABROTHERS (1.6.4.23.027/RAC/A). Diploma thesis, ULBI.

FASYA, ILMANIA and Fayaqun, Reza and Pramudita, Aditia Sovia (2023) ANALISIS PROSES PENGENDALIAN PERSEDIAAN BARANG PADA PT. GLOBAL TATA PERMATA MENGGUNAKAN METODE JUST IN TIME (JIT) UNTUK MEMINIMALKAN BIAYA PERSEDIAAN (1.6.4.23.044/ILM/A). Diploma thesis, ULBI.

MALAHAYATI, MUTIA and Pramudita, Aditia Sovia and Waskito, Saptono Kusdanu (2023) EVALUASI PEMILIHAN VENDOR LAMINATING SHEET DIVISI PENGADAAN INDUSTRIAL PT PINDAD MENGGUNAKAN METODE PROMETHEE I DAN PROMETHEE II (1.6.4.23.023/MUT/E). Diploma thesis, ULBI.

This list was generated on Mon Nov 25 15:47:13 2024 WIB.